© 2010 SavanSys. All rights reserved.
SavanSys Solutions, LLC
Supply Chain Cost Modeling
Home.News.Products.Services.Our Technology.Technical Papers.Contact Us.
WIRE BOND TRADE OFF COST MODEL

Model Highlights

 

Quickly see the cost impact as you make different design decisions.

 

 

The SavanSys Wire Bond Trade Off Cost Model is designed with a simple philosophy: maximize the number of possible inputs while minimizing the number of required inputs.  For parameters not known or specified, SavanSys will not only estimate it based on your other entries and the latest industry knowledge, but will show you the value used.  This allows an unparalleled level of estimating customization without any training.  Use the estimator to:

 

· Define characteristics of the assembly site, fabrication site, and the design.  See the columns to the right for a complete list of parameters.

 

· Compare against your previous results to easily understand how your modification affect the cost

 

· View the detailed costs—including labor, material, capital, tooling, and yield impacts—of every step in the assembly process

 

An optional enhancement to the estimator is to create a model calibrated to a specific supplier (internal or external).  We can work with you to calibrate the model or work directly with the supplier to create a certified supplier model.

What’s the cost impact of...?

 

Parameter List

Design

Assembly

Fabrication

Pkg Size

Labor Rate

Labor Rate

Pkg I/O

Lot Size

Utilization

Structure

Annual Vol

Panel Size

Design Rules

Lifetime Vol

Lot Size

Wirebond Count

Wafer Probe Yield

 

Wire Length

Utilization

 

Wire Material

Cost of Gold

 

BGA Pitch

 

 

umVia Count

 

 

Heat Spreader

 

 

Mold Comp.

 

 

Surface Finish

 

 

Die Size

 

 

Die Cost

 

 

Die Pad Pitch